Manor Gateway Roundabout
21/06/2016
Avtrade, Sayers Common
21/06/2016

Lime Tree School Highway

Edburton were employed as Principal Contractors to improve the pedestrian crossing points on the approaches to a newly built school at Redhill, Surrey. The works included:

  • Pedestrian improvement works at 6 locations including the installation of tactile crossing points, footway widening and crossing island construction

  • Installation of new traffic signals & toucan crossing points including management of the traffic signals contractor

  • Planning meetings with SCC streetworks and highways team including the raising of notices, managing permits and applications of road closures

  • Production of Traffic Management drawings for approval

  • Liaison with SCC Works Communication team to ensure that the public and local business were kept informed of the works

  • Working with lighting contractor to disconnect and reconnect street sign lighting


The project required in depth planning before commencement as the works were located across 6 distinct locations. Therefore individual permits needed to be applied for and managed throughout the works with the SCC Streetworks team.